Technical Feature |
Builder A (Minimal) |
Builder B (Advanced) |
Electrical |
Single Service 100/200 Amp panel. (Possible upgrade or shared service required.) |
Dual-Service, Dual-Lug Meter Socket. (Allows for separate metering of the basement suite.) |
Ventilation |
No intakes or exhausts for future suite. (Requires exterior siding alterations/repairs.) |
Extra vent hoods ready. (No alteration to exterior cladding; connections made inside.) |
Stairs |
Routered stringers. (Harder to finish with LVP flooring.) |
Notched stair treads. (Perfect for LVP flooring.) |
Solid Core Doors |
Standard hollow core. (Requires replacement to meet code.) |
Solid core fire-rated door installed. (In place for future fire and smoke separation.) |
|
|
The Saskatchewan Secondary Suite Incentive (SSI) Grant Program has been extended one year.The final date to incur eligible construction costs has been extended to March 31, 2027. Construction must be completed and applications received by December 31, 2027.
Click here for more info on this program. |
|
Sales: 306-370-7323
Office: 306-652-2707
Mailing: PO Box 27041
Saskatoon SK S7H 5N9 |
Plan details, pricing, and specifications are subject to change without notice.
Renderings are artist's concept only. E.&O.E. applies to all site content. |